HOME · CV · Imprint

Water · Energy · Waste
Environment · Development

Achim Riedel

Dipl.-Ing. Achim Riedel

Phones:
+49 172 6576108 Germany
+49 89 10119691 Germany

Email:
baumanagement@achim-riedel.eu

de en

Supervision Water Treatment Plant Al-Naser - Iraq

Design checking and site supervision of a water treantment plant and surrounding facilities

The Republic of Iraq received a loan from the World Bank for improving the water supply in the city Al-Naser, Thi Qar Governate. The whole project, of which the Al-Naser water treatment plant is part of, will improve the supply with clean water for about 250.000 people. In combination with the erection of new water supply systems also the capacity of institutions in planning, managing, supervision, project implementation, operation and maintains will be improved.
The proposed advanced water treatment process can ensure good quality water that would meet national standards and WHO drinking water standards. Schlegel Consulting Engineers is performing the site supervision services in cooperation with the Iraqi company Design for Future.

Project/technical data:

Intake structure, raw water lifting station
Raw water transmission pipe D=5.000 mm, l=700 m
Water treatment plant 24.000 m³/d
Storage tank 3.000 m³
Pumping station 35,6 m head
Transmission pipeline D=5.000 mm, l=1.000 m
Replacement of distribution pipes 15 km